Ticket #4245 (closed: fixed)

Opened 9 years ago

Last modified 5 years ago

CalculateUMatrix should require at least two peaks

Reported by: Andrei Savici Owned by: Andrei Savici
Priority: minor Milestone: Release 2.0
Component: Mantid Keywords:
Cc: Blocked By:
Blocking: Tester: Vickie Lynch

Description

If no indexed peaks, CalculateUMatrix fails. But one needs at least two non-collinear peaks to get the correct U matrix

Change History

comment:1 Changed 9 years ago by Andrei Savici

  • Owner set to Andrei Savici
  • Status changed from new to accepted

comment:2 Changed 9 years ago by Andrei Savici

Checked if there are enough non-collinear peaks. Refs #4245

Changeset: 2f4b91d744b72f5617d60cdffe71929e0b8466ff

Last edited 9 years ago by Andrei Savici (previous) (diff)

comment:3 Changed 9 years ago by Andrei Savici

  • Status changed from accepted to verify
  • Resolution set to fixed

comment:4 Changed 9 years ago by Vickie Lynch

  • Status changed from verify to verifying
  • Tester set to Vickie Lynch

comment:5 Changed 9 years ago by Vickie Lynch

  • Status changed from verifying to closed

Works with 2 or more peaks. Fails with 1 or 0 peaks.

comment:6 Changed 5 years ago by Stuart Campbell

This ticket has been transferred to github issue 5092

Note: See TracTickets for help on using tickets.