Ticket #4245 (closed: fixed)
CalculateUMatrix should require at least two peaks
Reported by: | Andrei Savici | Owned by: | Andrei Savici |
---|---|---|---|
Priority: | minor | Milestone: | Release 2.0 |
Component: | Mantid | Keywords: | |
Cc: | Blocked By: | ||
Blocking: | Tester: | Vickie Lynch |
Description
If no indexed peaks, CalculateUMatrix fails. But one needs at least two non-collinear peaks to get the correct U matrix
Change History
comment:1 Changed 9 years ago by Andrei Savici
- Owner set to Andrei Savici
- Status changed from new to accepted
comment:2 Changed 9 years ago by Andrei Savici
Checked if there are enough non-collinear peaks. Refs #4245
Changeset: 2f4b91d744b72f5617d60cdffe71929e0b8466ff
comment:3 Changed 9 years ago by Andrei Savici
- Status changed from accepted to verify
- Resolution set to fixed
comment:4 Changed 9 years ago by Vickie Lynch
- Status changed from verify to verifying
- Tester set to Vickie Lynch
Note: See
TracTickets for help on using
tickets.