Description

The Wish Reference frame is set up incorrectly in the instrument definition. This is at best misleading. The reference frame is part of the IDF schema and currently used in certain reflectometry routines. We ought to have it setup correctly.

Note to Anders: Should we go through and check this for all the IDFs, I suggest that quite a few of them are incorrect? Also, we should perhaps be able to detect that the IDF reference frame is wrong when we load the instrument? For example the major component of the vector between the source, sample and detector is probably the beam direction.

Change History

comment:1 Changed 8 years ago by Nick Draper

  • Milestone changed from Release 2.4 to Release 2.5

Moved at the code freeze for release 2.4

comment:2 Changed 7 years ago by Nick Draper

  • Milestone changed from Release 2.5 to Release 2.6

Moved to r2.6 at the end of r2.5

comment:3 Changed 7 years ago by Nick Draper

  • Component changed from Mantid to Framework

comment:4 Changed 7 years ago by Nick Draper

  • Milestone changed from Release 2.6 to Backlog

Moved to backlog at the code freeze for R2.6

comment:5 Changed 7 years ago by Nick Draper

  • Status changed from new to assigned

Bulk move to assigned at the introduction of the triage step

comment:6 Changed 5 years ago by Stuart Campbell

This ticket has been transferred to github issue 6854